Electric Melting Glass Furnace

It is possible to use rod electrodes with specially developed, water-cooled electrode holders or block electrodes. The electrodes can be installed in the furnac


Product Introduction

产品描述.jpg

It is possible to use rod electrodes with specially developed, water-cooled electrode holders or block electrodes. The electrodes can be installed in the furnace bottom or in the lateral walls of the tank or inserted from the top.

Appropriate positioning and wiring of the electrodes lead to reduced corrosion of the refractories and thus increase the furnace life. The most efficient concept is usually the usage of top electrodes. In case of a cold top furnace the batch is supplied by an area batch charger at an open side wall of the top. Alternatively a rotary roof can be used, which produces a homogenous and even batch layer. This layer insulates the glass bath from the environment, making additional insulation unnecessary. The melting, refining and homogenising processes in all electric furnaces are effected vertically.

All electric furnaces are not controlled by temperature but rather by electric resistance and batch thickness. There is a very delicate balance between these two measures making the furnace less flexible in respect to pull changes. The flexibility can be improved by means of furnace design.

The specific pull is higher and not comparable with fossil fuel fired furnaces due to vertical melting process. The glass quality can be drastically higher than in a fossil fuel fired furnace. For this reason, high quality specialty glass, e.g. for optical application, is molten with all electric furnaces.

The energy consumption of all electric furnaces is lower than the one of fossil fired furnaces. This is especially true for small furnaces, making small furnaces even more cost efficient. Increasing costs for CO2 allowances can be a deciding factor for all electric furnaces despite higher costs for electric energy in the near future.

产品描述.jpg

  • No dusting of the batch due to flame gases

  • Usage of a very cheap bag filter system is possible

  • Suitable for production of special glass with expensive, volatile and aggressive components in the batch

  • No emissions due to firing (NOx, CO2)

  • Shorter lifetime and thus shorter time until improvement

  • Short time from glass to glass in case of brick to brick repair

Q:Are you a manufacturer or trading company?

A:We have surely been a reliable manufacturer since 2006.

Q: When can I get the price?

A: We usually quote within 24 hours after getting your detailed requirements, like size, quantity etc. If it is an urgent order,you can call us directly.

Q: What about the lead time for mass product?

A: The lead time is based on the quantity, about 7-12days. For graphite product, apply Dual-use items license need about 15-20 working days.

Q:How to guarantee the quality of your products?

A:1) Strict detection during production. 2) Strict sampling inspection on products before shipment and intact product packaging ensured.

Q: How can l get a sample?

A: A free test sample can be supplied before your first purchase order, you only need to pay the freight cost.

Notes: The price is only for reference, for the accurate price and shipping cost, please contact us.

Get in Touch
Fill out the short form below and we will be in touch.
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram question-circle