What the particular construction kind of fireproof material liner narrates incinerator as follows.

1. Specific construction

(1) undertakes checking metrical to incinerator, look pull bricky board in good condition, set stock to not have be out of shape, furnace each place dimension whether with design standard conform to, whether does whole furnace accord with build by laying bricks or stones to build a demand.

(When 2) furnace accords with build by laying bricks or stones to build a demand, clear furnace wall clean, besmear next brush fluid sealant of bitumen fat high temperature.

(After 3) waits for fluid sealant to work, measure the central line of affirmatory incinerator and main elevation control line, make clear the fixed position line of position of lay off 7050mm.

(4) according to blueprint, it is with furnace casing guide face from below up ordinal build by laying bricks or stones builds tall aluminium to pledge adiabatic brick, heavy qualitative tall aluminium turns gently with zirconium corundum Mo Laishi brick, build by laying bricks or stones builds a process to build engineering construction standard strictly to undertake according to industrial furnace build by laying bricks or stones,

(5) every build by laying bricks or stones builds a heavy qualitative tall aluminium to turn the horizontal case that with zirconium corundum Mo Laishi brick uses gradienter, level to be in charge of brick of examination single block and local brick, diameter that with tape measure edge the central line of predefine measures liner layer, look to whether accord with a requirement, of sufficient to dissatisfaction demand undertake in time adjustment rectifying and reform.

(6) is in inclined build by laying bricks or stones builds paragraph of liner return remnant when 5 bricks are controlled, choose 4~6 the brick of layer of brick of the rest of name a person for a particular job undertakes beforehand lofting, look inclined paragraph whether can very good had received with straight Duan Xian,

(7) build by laying bricks or stones builds a course in, encounter incinerator furnace casing local and raised when be out of shape, namely actual diameter dimension is less than a design to produce size, when deflection is lesser, when build by laying bricks or stones is built, weigh facing qualitative tall aluminous brick or zirconium corundum the ash that Mo Laishi brick and tall aluminium of the layer intermediate pledge adiabatic brick contact is in gently is seamed stay small, in the meantime, facing pledges the level between Mo Laishi brick seams corundum of zirconium of occasional of tall aluminous brick again the puddle that stands by tall aluminium to pledge adiabatic brick is carried gently is a bit a few thicker, the puddle that working surface carries is a few thinner, such build by laying bricks or stones build a few bricks, will raised be out of shape the dimension error that cause searchs, ensure face of liner facing brick does not appear step, liner dimension accords with a requirement, become when deflection is bigger, criterion cut machines a brick, make liner dimension and normal paragraph liner dimension keeps consistent, contented requirement; encounters incinerator furnace casing local cave when be out of shape, namely actual diameter dimension is more than a design to produce size, when deflection is lesser, qualitative tall aluminous brick or zirconium corundum are weighed in facing the clearance of light qualitative adiabatic brick is in Mo Laishi brick and tall aluminium of the layer intermediate to be made up for directly with daub fill be out of shape dimension deviation, become when deflection is bigger, qualitative tall aluminous brick or zirconium corundum are weighed in facing Mo Laishi brick and tall aluminium of the layer intermediate pledge adiabatic brick clearance is in perfusion zirconium corundum gently Molaishi is pouring makings, search to be out of shape dimension deviation.

(In 8) construction, daub should wipe the build by laying bricks or stones in the brick equably to build a face to go up, go out through squashing to squeeze daub, ensure the brick seams daub full, after build by laying bricks or stones is built, liner surface undertakes ticking off seaming handling.