The main demand that roller path kiln installs

March 15, 2024Nov 25, 2024

      Roller path kiln is the large facility heating up labour with firing goods of floor tile of wall of pottery and porcelain. According to pottery and porcelain firing technology is sound the roller path kiln after the design, make through treatment, installation construction throws actual test-drive phase, enter next produce normally. Whether in reflecting design intent of the architect well and truly actual production, make roller path kiln seasonable, throw reasonably move, amount to at an early date produce add close, each paragraphs of the treatment of roller path kiln that make, working procedure that installs construction and technical parameter appear very important.

The treatment of roller path kiln is made reach measure of sue for peace of installation construction technology to narrate level technology requirement

 

 

Because roller,structure of kiln kiln system is section modulus assembly type, the thermal stress of the frame when soldering is out of shape is hard to avoid. And the stand or fall of quality of frame of furnace of kiln of this paragraph of working procedure goes to immediate impact below a series of working procedure, affect the kiln furnace in the future even whether use reach service life accident. Because this controls each technical parameter strictly,assure to solder each structural dimension undertakes strictly by blueprint. Want to control following technical parameter strictly so: (1) assures pillar span (namely center of pillar roller aperture is apart from) : ≤ ± 1.0mm; (2) assures error of level of center of pillar roller aperture: ≤ ± 0.5mm; (3) makes sure pillar roller aperture is diagonal: ≤ ± 2.0mm; (4) assures size of pillar roller hole: 1.0mm of fluctuation ≤ ± , or so ≤ 0.5 ± Mm; (5) assures on size error of modulus of kiln body frame: ≤ ± 2.0mm; (6) makes sure kiln wears whole to reduce knot surplus to be: ≤ ± 15mm.

Kiln furnace frame installs measure and technical requirement

Carry of the frame outside making ending kiln oven according to afore-mentioned parameter arrives after construction site, enter frame to install level (of course, according to particular case, also can build kiln furnace build by laying bricks or stones butt joint of construction building site is pulled to install) after ending. This is the kiln wearing working procedure that make is outspread, also be setup of system of next each wind, report, oil path and fireproof material build by laying bricks or stones to build prepare the job. Press construction order, enter from frame before assembling, whether does each index obtain close check above technical requirement of the regulation, be like short of, should have the corrective job of frame. Before installation, still check kiln furnace foundation reasonable, include: Bear load ability, horizontal error should be controlled inside limits of ≤ ± 10.0mm.

Each working procedure checks above end, enter the process that put a line. Determine position of kiln furnace center according to craft blueprint cardinal principle, error control is in ≤ ± 10.0mm (namely the center arrives between workshop pillar or wall center line distance) . After central position is firm, reach kiln furnace frame from the beginning end is ordinal arrange reach the designated position, affirmatory roller center arrives fiducial reference point of the foundation, in pile of kiln furnace around, pull steel wire to regard kiln furnace center as the line, it is line of standard center of kiln furnace frame with transmission center certainly, undertake with sruveyor's level the fixed position of each frame adjusts. Adjust control dimension is: (1) is kiln furnace center with steel wire, when adjusting each frame center and steel wire deviation: ≤ ± 1.5mm; (Center of the pillar between frame of body of 2) each kiln is apart from deviation: ≤ ± 1.0mm; (3) and affirmatory referenced datum mark are compared, error of transmission center level: ≤ ± 1.5mm. By 3 afore-mentioned technologies index adjustment is over after frame of each kiln furnace, comprehensive examination after be being made again, issue the on the rails of working procedure in order to ensure.

Setup of mechanical transmission system reachs a requirement

Transmission system is helical gear drive, this system includes bearing of device of drive electric machinery, decelerate, helical gear, oil groove and roller club. After step of brick of kiln furnace aperture is good, can have the setup of transmission system. Of course, want to be able to assure 1.0mm of ± of ≤ of error of horizontal of horizontal of aperture of aperture brick center and transmission roller great center only, also can build section of a construction project at kiln furnace build by laying bricks or stones independently. But anyhow, can install kiln furnace pillar to go up beforehand advocate, driven bearing just is in charge of, because eventually advocate, driven bearing piece and backing plate and fixed prop up can fluctuate between square canal adjust, in order to assure the standard of transmission. Installation is fine prop up square canal, undertake carrying the installation of bearing piece and backing plate and inclined tine actively, it is of driven end again next the installation of bearing piece, backing plate and roller marvellous driven pulley.

Install the oil groove of active end and oily lid next, it is the baseplate of drive electric machinery next, chain wheel of drive of electrify machine, join, chain. Flourish Cheng Naicai is the steel roller club that puts on around and the club of roller of pottery and porcelain of the belt intermediate next again, besmear on roller club before installing club of roller of pottery and porcelain inorganic of a silicate protects coating or Al2O3 pink. The transmission system of roller path kiln is to assure to be in the future below high temperature condition, change through a series of chemical physics, can carry ceramic smoothly another end from one aspect of the matter, achieve the goal of agglomeration. And in using a process actually, holding the position with accident-proneness, bigger pecuniary loss also is transmission system. Flourish Cheng Naicai provides high quality fireproof data for you.

Accordingly, transmission system is installed in roller path kiln is main crucial section of a construction project in the process. Make sure following technology asks: (Horizontal of 1) drive center asks: ≤ ± 2mm/100mm. (2) roller great center and deviation of aperture brick center: ≤ ± 1.5mm. (Marvellous length of roller of 3) pottery and porcelain asks: ≤ ± 3mm. (Marvellous diameter of roller of 4) pottery and porcelain asks: 40 ≤ of Φ design of different kiln furnace has ± 0.50.2(ground different roller way and precision requirement) . (5) assures deviation of differ in roll end diameter of roller marvellous diameter: ≤ ± 0.1mm(and direction of differ in roll end diameter is abhorrent sexual) . (6) makes sure roller club and roller cover form a complete set, do not appear the phenomenon that roller club fills in to be not covered into roller. (Additionally the content of club of roller of other pottery and porcelain changes 7) index also gets qualification. So these parameter are to make sure goods can be smooth in the future the premise condition that vertically carries another end from one aspect of the matter.

Setup of system of oil path, combustion reachs a requirement

Each pipeline system should include oil path in combustion system, and here indicates combustion system is to point to burner respect only. The pressure with offer motivation to arise constant through oil pump to the filter before pump from working oilcan and speed make oil sheds burner this paragraph of pipeline is the oil path that here alludes. According to technological arrangement, in independent oily pump house, it is commonly near pulverization fan room, install oil storage box, install vitta road again.

Build when the fireproof material build by laying bricks or stones that sets burner position after ending, can install burner, each vitta before burner, support combustion wind canal, pulverization wind canal also can undertake installing. Combustion system is in kiln furnace is a system that should notice safety in each system, in join installation so each oil, wind is in charge of when reaching each valve, wu wants guarantee against leakage oil, not air leak, the safe ability this pair future rises to assure action.

Control systematic installation and demand

The control system of this kiln furnace includes temperature to show show with control, pressure control with control, drive, call the police system, wait into appearance of kiln indication monitoring. Build by laying bricks or stones of each kiln body is built, setup of mechanical transmission system, ventilated system, combustion system ends, it is the installation of system of kiln heat control. Because each circuitry connection is complex circuit is interlocking a little out of control, can cause bigger accident to happen. So, each systematic circuitry control apart installation. Thermocouple is taken according to different temperature and graduation date chooses to install, link line. All control system asks control is quick, chain undertakes, indication delicacy, clear, accurate.

Overall build by laying bricks or stones builds kiln furnace working procedure and technical requirement

The overall build by laying bricks or stones of kiln furnace is built is will fireproof insulation material by the design requirement build by laying bricks or stones is built it is in kiln furnace frame, form a heat insolation, heat preservation and firing space, make sure below system of temperature, pressure, atmosphere fire gives eligible product.

1, before kiln furnace build by laying bricks or stones is built, complete the following work

(Of 1) fireproof material sample detect. According to the character of kiln of path of roller of pottery and porcelain, of fireproof material detect index basically has: ① exterior dimension; The content of ② Al2O3, Fe2O3; ③ weighs the change that burn a line; ④ coefficient of thermal conductivity; ⑤ thermal stability; Should father to close fireproof material quality, will come in order to assure the service life of kiln furnace, energy-saving fall bad news and hot labor demand. (After 2) fireproof material is eligible, examine the model of all sorts of fireproof insulation material, quantity, carry to kiln reserve near furnace. (3) checks all sorts of construction tools whether on deck. Common saying says: "Labour desire be apt to its thing, want first benefit its implement " . Accordingly, the reasonable, all ready tool that build furnace and construction machinery will assure to build the quality of furnace and work efficiency. The tool of general preparation has two kinds, build furnace tool and construction machine, include stir-fry before stewing child, feet of feet of bucket of rubber mallet, slop, small-sized handsaw, level, line dropping, cable inlet bracket, a place of strategic importance, sruveyor's level, construction machinery includes to cut the bricky machine, machine that grind a brick, mixer, carry small go-cart to wait (4) has been done with other the harmonious job of working procedure of each paragraphs of construction, the installation that includes plan control, pipeline and transmission. (The side panel outside frame of body of 5) general kiln is full go up neat. Above job ends, but start working undertakes overall build by laying bricks or stones builds kiln furnace.

2, build by laying bricks or stones builds technical demand

(1) fireproof mud immerses time is in 24 hours of above, and mix is even. (Slop of body of 2) build by laying bricks or stones is full degree: > 90% . (3) presses national level body of 2 kinds of build by laying bricks or stones undertakes build by laying bricks or stones is built, namely ash seams: ≤ 2.0mm. (4) width direction expands seam a requirement: 5mm; Length direction expands seam a requirement: 10mm. Appearance of all wall substance faces build by laying bricks or stones of each brick amlposition to build. 1.2m of every 1 ~ leaves tall temperate zone to expand together seam, every 1.5m leaves temperate zone in together, every 2m leaves microtherm area together. Bottom wall inter is in same cross section to unite leave 10mm to expand seam, each amlposition leaves side wall seam. All expanding seam the fireproof fine vinylon and cotton blend that takes crowded and corresponding norms according to each temperature. (5) build by laying bricks or stones builds construction to press the norms of fireproof insulation material of the requirement in blueprint, breed, dimension strictly to undertake. (Top of cotton of heat preservation of brick of 6) condole top, brick carrying side on the head, top, kiln expands seam reach end panel to expand felt of seamed heat preservation fiber, undertake in the spot by blueprint build by laying bricks or stones builds construction. (Dimension of all starting a hole presses 7) kiln body structure of the casing outside kiln furnace is all dimension of starting a hole is opposite should build by laying bricks or stones is built. Dimension of starting a hole includes trouble removal aperture, burner aperture, observation hole, thermocouple aperture, urgent air cooling to be in charge of aperture to wait. (8) should fill in the place of cotton of fireproof heat preservation must fill in full. (Wide passageway dimension asks inside 9) kiln furnace: ≤ ± 2.0mm. (10) kiln wall is perpendicular directional verticality requirement: ≤ 2mm/m. (Linearity of way of standard of 11) kiln wall asks: ≤ 5mm/100m. (Horizontal of center of 12) aperture brick should with outside horizontal of center of aperture of frame structure roller is in same plane, 1.5mm of deviation ≤ ± . (Build by laying bricks or stones of aperture of 13) trouble removal builds a face to keep level off, beautiful. Cheng Naicai product abounds flourish.

3, build by laying bricks or stones builds measure

(1) foundation build by laying bricks or stones builds standards of model of the material on blueprint, measurement and place build by laying bricks or stones to build fireproof insulation material. (2) decides and position of center of drive of the frame outside center of brick of aperture of computational side wall and kiln furnace. (3) build by laying bricks or stones builds side wall fireproof insulation material, next again build by laying bricks or stones builds bottom and fireproof insulation material, again right kiln furnace is enclosed condole supports. (4) begins build by laying bricks or stones to build from head of kiln furnace kiln commonly, more or less does the member that inspect construction person allocate build by laying bricks or stones to build,

4, heat preservation of kiln furnace conduit

The build by laying bricks or stones of kiln furnace builds the heat preservation project that still includes each wind valve. Conduit heat preservation basically is to show warm-up belt and cooling zone smoke a sirocco, flue gas to have the thermal insulation of the canal of this paragraph of wind of body drying to desiccator, the purpose is to decrease medicinal powder hot, assure to enter the aeriform temperature of oast to be controlled in 300 ℃ . Heat preservation of this paragraph of conduit, be heat preservation cotton (it is common and siliceous aluminium comes loose commonly cotton) bind after going up, outer layer laps an aluminous skin or stannic platinic paper. The key of conduit heat preservation is outside decorate a layer pack, requirement level off, beautiful, the worker operation that needs adroitness is finished. This working procedure solders conduit end and be certainly below the circumstance that does not have air leak phenomenon only reentry goes.

Installation of accessory equipment, conduit reachs other requirement

Accessory equipment includes from beginning to end fan of two platform, each model. Conduit includes each wind canal, vitta, tracheal, conduit to wait. After kiln furnace frame locates, while fireproof material build by laying bricks or stones builds kiln furnace, can undertake platform solders, all sorts of conduit solder installation, can build across to install construction with fireproof material build by laying bricks or stones. This working procedure should solder from platform first begin. Because platform is the foundation of each fan, dead load bears already above, must bear again in the future of each fan move load. Accordingly, installation solders when platform, should ensure foundation is firm and smooth, make sure design size is exact, make sure platform is stable, solder contact is beautiful. The counterpoint that is each wind canal next solders installation, each wind canal basically includes kiln head smoke evacuation, platoon wet be in charge of with circular wind, firing place of belt, urgent cold belt supports combustion each canal of canal of wind of smoke of the wind canal, pulverization wind canal, heat that take a platoon, urgent air cooling. Wind canal installation is commonly orderly from advocate wind is in charge of the canal that raise wind. Wind is in charge of solder requirement not air leak, design dimension strictly to undertake by blueprint.

Additional, because pulverization fan is independent at kiln body, besides park workshop, so pulverization wind canal can be put from the back undertake together with pipeline of oil path system. Also can undertake at the same time, inspect the site actual condition and calm, but should make sure wind is in charge of not air leak. Next hoisting each fan, want to notice the model of each fan right now, with each wind conduit join ends later. All wind are in charge of installation and with fan UniCom hind, installation joins the cooling water on corresponding fan is in charge of, position of cooling conduit dimension depends on spot circumstance and combinative blueprint undertakes installing. Of course, according to the spot actual condition, each measure can master above neatly. All and accessory equipment and the technical requirement that conduit installs are (when 1) solders air leak of strict guarantee against, slack. Each fan quality guards a pass strictly, especially pulverization fan () of Luo Ci fan.

Get in Touch
Fill out the short form below and we will be in touch.
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram question-circle