Wear-resisting is pouring expect by excel in aggregate, pink is expected mineral additive is comprised, via optimizing recipe design, have wear-resisting loss small, intensity random of tall, appearance sex of controallable, whole strong, construction performance of simple, construction is good, because mix high polymer polymer, make felt of concrete of its basic level firm. Excel in wear-resisting is pouring makings is low-cost, the construction place that asks to having wear-resisting is to recommend material.
Wear-resisting is pouring makings norms is as follows:
Wear-resisting is pouring makings construction demand and note:
1, wear-resisting is pouring expect by material accessary interpellate is deposited, quality of close check material wants before construction; 2, besmear hammer and coping place beforehand with net of reinforcing steel bar brush the bitumen lacquer; with 0.5 ~ thick 1mm
3, wear-resisting is pouring makings note makings should undertake strictly making up according to material specification, with mixer agitate, the makings that has mixed gives out inside 30 minutes fortunately, the makings after condensing piece do not allow to add water agitate to use; again
4, pouring before makings construction, should check catch a hammer whether weld, besmear the place on the hammer whether in good condition; 5, build by laying bricks or stones builds bitumen and plastic cap fireproof and pouring when makings, fore-and-aft reach transverse every other to make an appointment with 1.5m span to set expand seam, fill with rope of fiber of pottery and porcelain, seam wide ~ 5mm, expand seam should decorate
Between two anchorage firmware, should expand in arris edge or convex brim setting when seaming, expand seam should decorate in from this brim about the place of 300mm; 6, build by laying bricks or stones is built fireproof and pouring appropriate vibrating head vibration should be used when makings, pound solid;
7, fireproof and pouring after makings construction ends, should undertake by the requirement drying-out is handled, want to make sure drawing of patterns and natural conserve time achieve 24 hours first, offer drying-out curve to undertake drying-out according to supplier place next;
8, corresponding construction process can consult GB 50211-2004 " industrial furnace build by laying bricks or stones builds engineering construction to reach check and accept a standard " undertake construction;
9, pouring the sampling that makings physics, chemistry examines needs to press GB/T17617 and the following regulation to undertake: (1) sampling is sending packet of square, inspect unit of manage, installation, contract square delegate supervises next finishing;
(2) sampling should at least 3 people are finished, each sampling should issue random sampling; in the case that does not get any ties (3) detect index needs to accord with corresponding check mark to allow, all need to satisfy domestic corresponding standard without what provide check-up to measure a requirement. 10, fireproof heat-insulation layer examines the method consults
GB50211-2004 " industrial furnace build by laying bricks or stones builds engineering construction to reach check and accept a standard " or corresponding new standard undertakes examining;
11, finishing hind pouring use what expect index of contented material function and spot operating mode fall normally.
Zhengzhou Rongcheng acts on the principle that bears the blame to the client, strict control wear-resisting is pouring standard of makings tall purity, ensure manufacturing wear-resisting is pouring makings can have good high temperature resistant function, the capability that fight broken bits is strong, can get used to a client the moving temperature of actual boiler, product quality more
Was to get of broad new old user mix reputably all the time support, welcome everybody the incoming telegram seeks advice and choose and buy, flourish Cheng Naicai will act on cordial attitude of attending to guests to the boiler that offers major is transformed and build program to you.